Would you like to learn more ?

How do I wire my WSM-63 to my DS2 controller?


The 120V coil of the WSM-63 is powered between the one leg of 240VAc and a neutral they. Do NOT run both hots to the WSM-63. Please refer to the installation manuals for further information.

What are the three setting dials around the large timer on the WSM-63?


The three dials around the large timer dial on the WSM-63 allow you to change the settings of the controller. A Yellow LED: power ON (U) B Red LED: timing in progress (C) C Unit of time selected D Time scale selector E Function selected F Function selector: AI, DI, GI, SW, BE, CEa, DE […]

How do I wire my WSM-63 to my ETO2 controller?


Wiring the WSM-63 and ETO2 together is a great way to be able to control the WSM-63 timer panel with a pavement sensor.   Pull the power from terminals 2 and 5 and input into the L and N on the ETO2 controller. The ETO2’s programming, closes one relay as it receives a signal from […]