Installation

Where do I install the DCM-PRO Factory Joint?


This page explains the positioning of the factory joint to ensure a successful installation of your Warmup heating system.

How long is the cold lead on the DCM-PRO cable?


The conductor cores and ground braid of the 10′ cold lead are factory joined in a water resistant joint assembly to each supply conductor and ground conductor of the unheated lead.

Where do I run the cold lead and sensor probe during DCM-PRO installation?


The cold tail lead and the sensor probe should be run in separate conduits. This will prevent any interference from the cold tail lead affecting the temperature readings from the sensor probe.

What is the correct DCM-PRO cable spacing?


This page explains the DCM-PRO spacing guidelines and recommendations.

How do I test my NAMSR self-regulating cables?


This page explains the purpose of testing your self-regulating cables and how to perform these tests.

What is the best way to lay asphalt over a Heated Driveway?


This is a summary of the recommended installation practices when installing asphalt over a Warmup heated driveway system.

Mounting the 3iE Energy Monitoring Floor Heating Thermostat


Read this before choosing your gang box. Click “Read More” for important information.

Mounting and Installation


Here you will find some helpful tips for the successful installation of your snow melting controller.  Click “Read More” for details.

DS2 or DS5 Installation Example


Take a look at an actual DS2 or DS5 installation example.  Click “Read More” for details.

I installed my DS8 and my heating system but it is not melting any snow or ice.


You will need to examine the positioning of moisture sensor of your snow melting controller.  Click “Read More” for details.

Scroll to Top