Wiring

Where do I run the cold lead and sensor probe during DCM-PRO installation?


The cold tail lead and the sensor probe should be run in separate conduits. This will prevent any interference from the cold tail lead affecting the temperature readings from the sensor probe.

Do you have to wire the floor sensor probe that comes with the 3iE thermostat?


That floor probe is an important part of having your floor heating system function properly.  Click “Read More” for details.

How to wire the 3iE Energy-Monitoring Floor Heating Thermostat


Learn how to wire your 3iE and probe for both 120V and 240V configurations.  Always use a licensed electrican.  Click “Read More” for details.

How To Wire the DS-2C Controller?


Take a look at the wiring configuration of the DS-2C controller.  Click “Read More” for details.

Wiring the DS-5 Controller


Take a look at the wiring configuration of the DS-5.  Click “Read More” for details.

DS-8 Controller Wiring


Take a look at the wiring configuration of the DS-8.  Click “Read More” for details.

ETOG Wiring


The ETOG snow and ice melting ground sensor must be wired to specific terminals inside the ET02 controller.  Click “Read More” for details.

Additional Wiring of the TRF115-005


Click “Read More” for additional wiring instructions for your roof and gutter snow and ice removal controller.

How to wire the WUDG floor heating thermostat


Uncomplicated wiring instructions at your fingertips.  Always use a licensed electrician.  Click “Read More” for details.

Basic Installation of the In-slab Floor Heating Cable


Warmup In-slab Floor Heating Cable is designed to be placed within the cement slab of at least 2” (50mm) in thickness, with at least 11/8” (30mm) of the slab above the heating wire. For thicker pour of up to 6”, elevate the wire mesh on which the cable is tied with bricks, wood blocks or other spacers to float the cable at the desired level. Depending on the construction of the subfloor and in general, in order to improve the efficiency of the system, you may need to apply insulation prior to the pour.

Scroll to Top